2025 14th Ave. S
Seattle, WA 98144
About Beacon Hill
Main Office: 206-252-2700
Fax: 206-252-2701
Beacon Hill School Profile
Attendance Area School Attendance Area Map
School Leadership and Board District
Community Partners at Beacon Hill 比肯山小学的社区资源和项目
Continuous School Improvement Plan (C-SIP)
Beacon Hill International Elementary C-SIP
学校持续改善计划(C-SIP)是每所学校的行动计划 它确定了学校在当前和即将到来的学年计划重点关注的领域, the performance goals they want students to achieve, 以及学校计划如何合作实现这些目标.
这些计划会定期更新,以反映每所学校正在使用的策略. 这个文件也可以作为我们的标题I学校全校范围内的改进计划.
School and Building Reports
School Report
Beacon Hill International Elementary School Report
学校报告显示了一个学校学术发展的简要快照, student climate, accountability, family and staff engagement, and overall school performance. 学校报告由州公共教育监督办公室为该州的每个学校和地区制作,并在全年定期更新数据.
On state assessments, students who are expected to participate but do not, such as absences or opting out, are counted as non-proficient. 这可能会影响学校的整体水平评级.
Questions about school reports? Contact the Research and Evaluation Department research@hljrhmy.com
School Climate Survey
比肯山国际小学气候调查
学校气候调查用于改善学校水平, climate surveys are given to all staff, students and families each year. The staff and student surveys are given to respective groups in person at schools; the family survey occurs in the spring.
Building History
灯塔山国际建筑历史和信息
Asbestos Hazard Emergency Response Act (AHERA)
本署每六个月派专人监察灯盏山国际大厦内已知的石棉,以评估含石棉建筑材料的状况。. 6个月的评估结果由地区保存.
As required under AHERA, 碧肯山国际小学必须保持石棉管理计划(AMP),并将其保存在学校档案中. AMP可在周一至周五的上课时间进行审查. For additional information, please contact:
Wendy Couture
Environmental Health and Safety Manager
wjcouture@hljrhmy.com
206-252-0528
Discipline Dashboard
As part of Seattle Excellence, Seattle Public Schools’ Strategic Plan, 该地区致力于中断不合比例的纪律做法. 支持这项工作,提高透明度和问责制, 该学区为每所学校创建并发布了面向公众的纪律指示板,并于11月1日发布, 2021.
纪律仪表板数据反映了当前学年,并将在整个学年每季度更新一次. 如有任何疑问或疑虑,请联系具体学校的学校领导.
Academic Year: Current academic school year.
Accessible/Default:点击这里切换到仪表板的可访问版本.
Actions by Month:按月份和开除类型划分的纪律处分次数.
Actions: Count of disciplinary actions for an exclusion type.
Attribute:学生属性(性别,种族/民族,所服务的特殊教育,504计划)
Days: Count of exclusion days for an exclusion type.
Days of Exclusion: Count of exclusion days.
Discipline Rate:至少有一次违纪事件的学生人数除以所有在校生人数.
E. Expulsions:学生属性的紧急开除次数.
Enrolled: Count of enrolled students.
Exclusion Actions:学生属性的排除操作计数.
Exclusion Days: Count of exclusion days for a student attribute.
Exclusion Type: Short-term suspension (SS), Long-term suspension (LS), Emergency expulsion (EE), In-school suspension (IS), Expulsion (EX), and Interim alternative education setting (IA).
Exclusionary Actions: Count of exclusionary actions.
Expulsions: Count of expulsions for a student attribute.
FERPA Compliance: Family Educational Rights and Privacy Act Compliance. *
Incidents by Day of Week: Count of disciplinary actions by day of week.
Incidents by Grade: Count of disciplinary actions by grade.
Incidents by Hour: Count of disciplinary actions by hour.
Incidents by Exclusion Type: Count of disciplinary incidents for an exclusion type.
Incidents by Student Attribute or Support Service: Count of disciplinary incidents. 有多少学生参与其中,事故就会被计算多少次.
Incidents per 100 Students:违纪事件数除以在校生数,再乘以100. 有多少学生参与其中,事故就会被计算多少次.
Rate: Discipline rate for an exclusion type.
School Name: School name.
Students:至少有一次违纪事件的学生人数.
Suspensions: Count of suspensions for a student attribute.
Weapons:涉及武器的纪律事件数目.
*请注意:当一个小组少于10名注册学生时, 至少两个最小组的所有值都将被抑制.
Beacon Hill Levy Projects
BEX II
Levy Approved : 2001
Project Description
便携式教室被一个新的教室和一个自助餐厅/礼堂所取代.
- Building Size: 53,715 gross square feet
- Capacity: 385 students (grades K-5)
- Site Size: 1.94 acres
- Total Cost: $8.4 million
- Completion: Date February 2006
- Architect: Burr Lawrence Rising + Bates Architects
- Contractor: Various
About BEX
卓越建筑(BEX)资本征费用于资助现代化或更换老旧建筑物的项目, fund technology for student learning, 处理整个地区的地震和安全问题以及主要的预防性维护需求.
2001年,西雅图选民通过了价值3.98亿美元的“卓越建筑II”(BEX II),以取代即将到期的“卓越建筑I”资本税. 它为整个地区的学校翻新或新建提供了资金.
BTA II
2004年,西雅图选民通过了BTA II资本税. 该基金资助了该地区每所学校近700个设施改善项目和技术升级.
- 2011 : Installed energy-efficient heating controls. Replaced select exhaust fans and ceiling diffusers. Installed water meter.
- 2009 : Computer network upgraded to fiber optic, 提高学生和教师运用科技作为教育工具的能力.
BTA I
The $150 million Buildings, 科技及学术/体育(BTA I)资本征款于一九九八年二月获投票通过. BTA I在该市的每所学校资助了超过465个大小设施项目. The projects included safety and security upgrades, 更换屋顶和窗户,技术和运动场升级.
- 2004 : BEX II改造,更换便携设备,增加自助餐厅/礼堂
- 2002 : Reroof
- 2001 : Accelerated Technology Improvement Program
About BTA
The Buildings, 技术和学术(BTA)资本税支持该地区的长期计划,以升级和翻新老化的学校设施,并解决入学人数增长问题.
The BTA IV Capital Levy was approved by voters in 2016. 十大正规网赌软件将从2017年到2022年获得这些税收基金.
Enroll at Beacon Hill International